Option 1 – “Basic” design

preparing full technical documentation in the form of a printed design book

a cost estimate of the materials necessary for the completion of the design + estimated offers of contractors as of the date of preparation of the cost estimate – the cost estimate in the form of an Excel table with the image, price and calculation of the quantity of materials needed

preparing moodboards (stylistic boards) for each room (excluding laundry room, boiler room, garage, pantry) – 1 version

preparing photo realistic visualisations – 1 frame for each room, excluding the laundry room, boiler room, garage, pantry
(additional visualisations extra payable)

2 meetings in shops – (selection of tiles, doors, floors, sanitary ware, taps, upholstered elements on request)

2 conceptual meetings with the Investor 

the construction team is on the Investor’s side

the offer shall not include renovation or architect’s supervision


Option 2 – design with the “architect’s visits”

preparing full technical documentation in the form of a printed design book

a cost estimate of the materials necessary for the completion of the design + estimated offers of contractors as of the date of preparation of the cost estimate – the cost estimate in the form of an Excel table with the image, price and calculation of the quantity of materials needed

preparing moodboards (stylistic boards) for each room (excluding laundry room, boiler room, garage, pantry) – 1 version

visualisations – 1 frame for each room + the pool included in the price – 3 frames

2 meetings in shops – (selection of tiles, doors, floors, sanitary ware, taps, upholstered elements on request)

3 conceptual meetings (in the office and online) – up to 2 hours each

4 arrivals on the construction site – as part of the architect’s visits

the construction team is on the Investor’s side

The number of arrivals at the construction site as part of renovation visits, in order to check the compliance of theworks performed with the design:

1

ARRIVAL

checkingelectrical
and plumbing installations

2

ARRIVAL

checking the arrangement
of tiles and stucco

3

ARRIVAL

the meeting with a carpenter
on the site

4

ARRIVAL

determining the remaining
elements made to order


Option 3 – design with “full architect’s supervision and coordination of finishing/renovation works” – the Miśkiewicz Design team

preparing full technical documentation in the form of a printed design book

recommending a renovation team – cooperation with the team recommended by Miśkiewicz Design only

a cost estimate of the materials necessary for the completion of the design + estimated offers of contractors as of the date of preparation of the cost estimate – the cost estimate in the form of an Excel table with the image, price and calculation of the quantity of materials needed

preparing the cost estimate of the works of the renovation team – coordination of the team’s work 

preparing the design works schedule together with an estimate of the commencement of finishing/renovation works

preparing offers of suppliers and subcontractors (1 proposal)

preparing moodboards (stylistic boards) for each room (excluding laundry room, boiler room, garage, pantry) – 1 version

visualisations – 1 frame for each room + the pool of 3 frames included in the price.

3 meetings in shops – (selection of tiles, doors, floors, sanitary ware, taps, upholstered elements on request and the like)

3 conceptual meetings with the Investor 

The architect’s supervision includes:

conformity control of the works being performed and the Design

arranging the renovation works schedule with the main contractor – compliance check

recommendations concerning contractors and subcontractors

constant telephone and e-mail contact with the renovation team

in the case of building a house – possible consultation with experts/contractors on the Investor’s side

up to 6 arrivals per month, driving outside Warsaw additionally charged

control of deliveries and measurements by subcontractors

assembly control

subcontractors’ works acceptance

receipt of deliveries to be agreed individually (receipt by the client, receipt by the contractor’s team) – it shall not apply to household appliances.

Magdalena Miśkiewicz

The coordination of orders (drafting offers, invoicing, keeping track of delivery dates) concerns the following categories:

floor

door

fittings/sanitary ware

air-conditioning/central vacuum cleaner

carpeting

steel elements

stairs and railings

tiles – gres, sinter, stone, agglomerate, etc.

lighting

wall coverings

glass elements

fixed joinery

household appliances

custom furniture

upholstered furniture

window decorations

others

As part of the coordination, we send one offer.

Scroll to Top